Funnies Extra!

Basin Electric proposing to help power Oil Patch

12/01/11 (Thu)

Basin Electric Power Cooperative is proposing the construction of a 200-mile transmission line from a power plant near Beulah to help power the Oil Patch.
The 345-kilovolt transmission line is proposed to run west from Basin Electric’s Antelope Valley Station near Beulah through about 17 miles of Mercer County, around the western end of Lake Sakakawea, to substations near Grassy Butte, Williston and Tioga.